Launch offer Starter at 40% off — pricing goes up on 15 September days See the plans
HomeDocuments › Final inspection checklist

Final Inspection Checklist

The last look before the money moves.

Download for Word Download plain text

Free, no sign-up. 6 sections, 31 checks. Edit it to fit your own transaction.

The final inspection is the last moment at which a problem is the seller's rather than yours. Once completion happens, an appliance that has been removed, a leak that appeared last week, or a garden full of the seller's rubbish becomes your expense and your inconvenience.

It should be done as close to completion as possible, ideally with the property empty, and with the list of included items from the contract in your hand rather than in your memory.

The template — this is exactly what you download

Bring these with you

  • The list of fixtures and fittings included in the sale
  • Photographs from your viewings
  • The survey or inspection report and any agreed remedial works
  • A phone with a torch and camera, and a charger to test sockets
  • Your lawyer contact details, reachable during the inspection

Items that should still be there

  • Every appliance listed in the contract, in place and connected
  • Light fittings, blinds and curtain rails as agreed
  • Floor coverings that were included
  • Garden structures, sheds and planting that formed part of the sale
  • Keys for every door, window, garage, meter cupboard and shared entrance
  • Manuals, warranties and service records for heating and appliances

Things that must work

  • Heating fires and reaches temperature
  • Hot water at every tap
  • Every light switch and a sample of sockets in each room
  • Toilets flush and refill, sinks and baths drain freely
  • Windows and external doors open, close and lock
  • Any alarm, entry system or electric gate, with codes handed over

Condition since you last saw it

  • New damp patches, stains or cracks not present at the survey
  • Damage to walls, floors or doors from the seller move-out
  • Leaks under sinks and around appliances that have been disconnected
  • Roof and gutters after any storm since the survey
  • Agreed remedial works actually completed, to the standard agreed

Left behind and cleared

  • Property empty of everything not included in the sale
  • Loft, cellar, garage, shed and outbuildings cleared
  • Rubbish and garden waste removed rather than bagged and left
  • Property cleaned to the standard agreed

Readings and handover

  • Photograph every utility meter with the reading visible
  • Note the reading, meter serial number and the date and time
  • Confirm which suppliers serve the property
  • Confirm bin collection day and any recycling arrangements
  • Count and label every key and remote handed over
Check this locally. This template is a general starting point, not legal advice. Property, tenancy and consumer law differ in every country and often between regions of the same country. Check what is required where the property is located, and take professional advice before signing or serving anything that creates a legal obligation.

Do it before the money moves, not after

Once funds are transferred, your leverage is gone and a dispute becomes a claim rather than a negotiation. Arrange the inspection for the morning of completion or the day before, and tell your lawyer you intend to do it.

If something is wrong, call your lawyer immediately

Do not raise it directly with the seller or the agent first. A retention from the completion funds can usually be agreed while the transaction is still live, and that is a conversation between lawyers. It is very difficult to arrange an hour after completion.

Photograph everything, including what is fine

Dated photographs of meters, appliances and each room protect you in both directions — against a later claim that you damaged something, and as evidence of condition if a defect emerges within weeks.

Common questions

Am I entitled to a final inspection?

It is customary in most markets and sellers rarely refuse, but it is not always a contractual right. Ask for it when the completion date is agreed rather than on the day, so it is expected rather than a surprise.

What if an included item has been removed?

Contact your lawyer before completion. Where the item is listed in the contract, a retention or price adjustment can normally be agreed while funds are still held. After completion your only route is a claim, which rarely justifies the cost.

Should I inspect if the property is still furnished?

Yes, but arrange a second look once it is empty if you can. Furniture hides damage to floors and walls, and an empty property reveals in ten minutes what a furnished one conceals entirely.

💼 Are you a real estate agent or broker? Send this calculator to your buyers on your own branded listing page — every enquiry comes straight to your WhatsApp. Create free agent page →

Turn a calculation into an enquiry

Buyers who run these numbers are ready to talk. Give every listing its own page with your photo, phone and WhatsApp on it — leads land straight on your phone.

Create your free property page